Overview
In San Antonio, business sign permits are issued by the Development Services Department. Most applications are submitted through the city's online permitting portal, which allows document uploads and status tracking. Illuminated signs require both a sign permit and a separate electrical permit issued by the electrical inspection division.
Sign rules in San Antonio are tied to your zoning district. Before designing your sign, look up your property's zone using the city's online zoning map and confirm what sign types and sizes are allowed in that zone.
What Requires a Sign Permit in San Antonio
- All permanent wall-mounted signs (illuminated and non-illuminated)
- All freestanding signs (monument, pole, pylon)
- All illuminated signs of any type or size
- Window signs exceeding the local coverage threshold (typically 25โ30%)
- Temporary banners displayed longer than 14โ30 days
- Digital and electronic message center signs
Application Checklist
- โCompleted permit application (via SA One Stop portal)
- โSite plan showing property and sign location
- โSign drawings with exact dimensions and materials
- โPhotograph of existing building face
- โProperty owner / landlord authorization letter
- โElectrical drawings + licensed electrician info (illuminated signs)
- โPermit fee payment
Typical San Antonio Sign Permit Fees
| Sign Type | Estimated Fee | Notes |
|---|---|---|
| Wall sign (non-illuminated) | 5โ60 | Base + per sq ft |
| Wall sign (illuminated) | 5โ20 | Electrical permit separate |
| Monument / ground sign | 0โ80 | Engineering may be required |
| Pole / pylon sign | 20โ50 | Engineering typically required |
| Temporary banner | 5โ0 | Per permit period |
| Electrical permit (illuminated) | 0โ00 | Separate from sign permit |
Fees are estimates. Verify current fee schedule at sanantonio.gov/dsd.
Review Timeline
- Simple non-illuminated wall sign: 5โ15 business days
- Illuminated sign: 2โ4 weeks
- Freestanding sign: 3โ6 weeks
- Signs in historic or overlay districts: 4โ8 weeks
Contact Information
| Contact | Details |
|---|---|
| Department | Development Services Department |
| Portal | SA One Stop portal |
| Website | sanantonio.gov/dsd |
Applying for a San Antonio sign permit?
Download our sign permit application checklist to prepare your submission package.
Download Checklist โ All Texas Cities โDisclaimer: This guide reflects San Antonio permit procedures as of 2024โ2025. Always verify current requirements at sanantonio.gov/dsd.